Journal article
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
- Abstract:
- We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth > 23 MHz. The system meets the requirements for CLIC.
- Publication status:
- Published
- Peer review status:
- Peer reviewed
Actions
Access Document
- Files:
-
-
(Preview, Version of record, pdf, 499.1KB, Terms of use)
-
- Publisher copy:
- 10.1103/PhysRevAccelBeams.21.011001
Authors
- Publisher:
- American Physical Society
- Journal:
- Physical Review Accelerators and Beam More from this journal
- Volume:
- 21
- Pages:
- 011001
- Publication date:
- 2018-01-09
- Acceptance date:
- 2018-01-09
- DOI:
- EISSN:
-
2469-9888
- Pubs id:
-
pubs:865094
- UUID:
-
uuid:f2e842ab-1913-46ec-83b5-f83b998e968c
- Local pid:
-
pubs:865094
- Source identifiers:
-
865094
- Deposit date:
-
2018-07-07
Terms of use
- Copyright holder:
- Burrows et al
- Copyright date:
- 2018
- Notes:
- Published by the American Physical Society under the terms of the Creative Commons Attribution 4.0 International license. Further distribution of this work must maintain attribution to the author(s) and the published article’s title, journal citation, and DOI.
- Licence:
- CC Attribution (CC BY)
If you are the owner of this record, you can report an update to it here: Report update to this record