Journal article icon

Journal article

Stabilization of the arrival time of a relativistic electron beam to the 50 fs level

Abstract:
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth > 23 MHz. The system meets the requirements for CLIC.
Publication status:
Published
Peer review status:
Peer reviewed
Version:
Publisher's version

Actions


Access Document


Files:
Publisher copy:
10.1103/PhysRevAccelBeams.21.011001

Authors


Roberts, J More by this author
Skowronski, P More by this author
More by this author
Institution:
University of Oxford
Division:
MPLS Division
Department:
Physics; Particle Physics
Christian, GB More by this author
Corsini, R More by this author
Expand authors...
Publisher:
American Physical Society Publisher's website
Journal:
Physical Review Accelerators and Beam Journal website
Volume:
21
Pages:
011001
Publication date:
2018-01-09
Acceptance date:
2018-01-09
DOI:
EISSN:
2469-9888
Pubs id:
pubs:865094
URN:
uri:f2e842ab-1913-46ec-83b5-f83b998e968c
UUID:
uuid:f2e842ab-1913-46ec-83b5-f83b998e968c
Local pid:
pubs:865094

Terms of use


Metrics



If you are the owner of this record, you can report an update to it here: Report update to this record

TO TOP