Journal article icon

Journal article

The CLIC BDS towards the Conceptual Design Report

Abstract:
The CLIC Conceptual Design Report must be ready by 2010. This paper aims at addressing all the critical points of the CLIC BDS to be later implemented in the CDR. This includes risk evaluation and possible solutions to a number of selected points. The smooth and practical transition between the 500 GeV CLIC and the design energy of 3 TeV is also studied.

Actions


Authors


Expand authors...
Journal:
IPAC 2010 - 1st International Particle Accelerator Conference
Pages:
3419-3421
Publication date:
2010-01-01
Source identifiers:
439730
Language:
English
Pubs id:
pubs:439730
UUID:
uuid:02363ebb-5433-4cd9-b4b3-d1ddb6bdb271
Local pid:
pubs:439730
Deposit date:
2013-12-13

Terms of use


Views and Downloads






If you are the owner of this record, you can report an update to it here: Report update to this record

TO TOP