Conference item icon

Conference item

Non-contact force measurement for current collection in a 25kV overhead line electrified railway

Abstract:
Network Rail's Western Route is undergoing a wide-ranging modernisation programme, with £7.5bn investment in 175 miles of electrification and infrastructure upgrades allowing the introduction of four new fleets of train by 2019. This paper reviews the potential utilisation of camera imagery to inform maintenance processes that need to absorb a step change in pantograph movements and OLE management.
Publication status:
Published
Peer review status:
Peer reviewed
Version:
Accepted manuscript

Actions


Access Document


Files:

Authors


More by this author
Institution:
University of Oxford
Division:
MPLS Division
Department:
Engineering Science
Role:
Author
More by this author
Institution:
University of Oxford
Division:
MPLS Division
Department:
Engineering Science
Oxford college:
St Hughs College
Role:
Author
Publisher:
Institution of Engineering and Technology Publisher's website
Issue:
CP701
Publication date:
2016-09-05
Acceptance date:
2016-05-23
Pubs id:
pubs:694070
URN:
uri:d0ad49d4-cd33-43e1-a587-e5e6bef69ece
UUID:
uuid:d0ad49d4-cd33-43e1-a587-e5e6bef69ece
Local pid:
pubs:694070

Terms of use


Metrics


Views and Downloads






If you are the owner of this record, you can report an update to it here: Report update to this record

TO TOP